Affected services:

  • Network DC1
  • Network DC2

Maintenance on Oslo Fiber

Scheduled for Thursday 9th January 2020 at 00:01 (Stockholm)

Schedule/description of work

There is scheduled maintenance on our Oslo Fiber with supplies us with Blix transit and NIX/FIXO connections. This maintenance should improve both latency and stability of the link. Estimated downtime is around 1 hour in the mentioned timeframe.

As we have multiple transits, customers should not be affected by this maintenance.

Scheduled start time
January 09, 2020 00:01
Duration
3 hours
Status
Finished

Updates

Maintenance has completed and we're bringing the link back up.

Posted by Andreas Haakonsen

We are shutting down the link to Oslo in preparation for the maintenance. Higher latency towards some networks are to be expected for a few minutes while BGP converge.

Posted by Andreas Haakonsen